Project overview
Climate Edge Consult successfully completed the installation of two 400kVA Automatic Voltage Stabilizers (AVS) to enhance the reliability and stability of the hospital’s electrical power supply.
The project involved equipment removal, structural preparation, electrical installation, and comprehensive testing to ensure seamless integration with the existing electrical infrastructure. Every stage was carried out under strict safety procedures to minimize disruption to hospital operations.
Briefs & Objectives
The project was initiated to improve power quality and protect critical hospital equipment from voltage fluctuations. Our objective was to install and commission two Automatic Voltage Stabilizers safely and efficiently while ensuring uninterrupted electrical services throughout the project.
Our Philosophy & Solutions
Climate Edge adopted a structured installation approach beginning with site preparation, safety planning, and removal of existing equipment. Structural modifications, electrical cabling, and AVS installation were carefully coordinated before comprehensive testing and commissioning. Every phase was executed with strict quality control to ensure safe, reliable, and long-term system performance.
Planning & Preparation
Existing System Dismantling
AHU Installation & Integration
Civil & Supporting Works
Testing & Commissioning
Final Inspection & Handover
Key Features
This project successfully enhanced the hospital’s electrical infrastructure through the installation of two high-capacity Automatic Voltage Stabilizers.
PROJECT OUTCOME
The successful installation and commissioning of the two 400kVA Automatic Voltage Stabilizers improved power quality, enhanced system reliability, and provided stable voltage protection for critical hospital operations. The project was completed safely, on schedule, and with minimal disruption to the facility’s daily activities.
Charles Tazei
President / Founder – CT Group Holding
Hospital Kuala Lumpur (HKL) – Fan Coil Unit (FCU) Control System Upgrade Works
Climate Edge Consult Sdn. Bhd. has been appointed to undertake the upgrading works for the Fan Coil Unit (FCU) control system at Hospital Kuala Lumpur (HKL). The project focuses on improving the reliability, maintainability and operational efficiency of the existing FCU infrastructure through the installation of a modern Building Automation and Control System (BACS).
The scope of works comprises three primary components. Firstly, the supply, fabrication and installation of dedicated FCU electrical control panels complete with the necessary protection devices, power distribution, control equipment and termination facilities. Secondly, the installation of all associated containment systems including conduits, trunking, cable trays and field cabling to establish a robust electrical and communication network between the FCUs, sensors and control panels. Finally, the project includes the installation, testing and commissioning of intelligent controllers, sensors, actuators and IP-based communication devices to enable seamless monitoring and control of each FCU through a centralised platform.
Upon completion, the upgraded system will provide real-time operational visibility of each FCU, allowing maintenance personnel to monitor equipment status, operating parameters, alarms and performance remotely. The new control architecture is designed to improve equipment reliability, simplify troubleshooting, reduce downtime and support proactive maintenance strategies. All works are carried out in accordance with hospital engineering requirements while ensuring minimal disruption to critical healthcare operations. The completed system will provide a scalable backbone that supports future expansion and integration with the hospital’s wider Building Management System (BMS), contributing towards improved energy efficiency, operational resilience and long-term asset management.
Charles Tazei
President / Founder – CT Group Holding